Pinards PDF

Celit 4D. Done. Comment. views. 0 faves. 0 comments. Taken on August 20, Some rights reserved. Flickr is almost certainly the best online photo management and sharing application in the world. Show off your favorite photos and videos to the world, securely. Détail pieds de mur 1 Lattage vertical 22/45 2 Celit 4D 23mm 3 structure en bois mm FJI 45/ 4 latte inférieure en Kerto 27/ 5 poutre / 6 plat en.

Author: Zulugal Tajinn
Country: Turkmenistan
Language: English (Spanish)
Genre: Science
Published (Last): 27 September 2015
Pages: 76
PDF File Size: 19.36 Mb
ePub File Size: 17.62 Mb
ISBN: 668-6-50940-314-3
Downloads: 65787
Price: Free* [*Free Regsitration Required]
Uploader: Akilkree

Start at the lower end of the module array.

Menisoss sprl

The aim of this guideline is not focused on the installation process of the BIPV modules, celih the construction process of the substructure needed to install them. Some are placed with their original length cm while some other are cut. Examples of non-ventilated asphalt shingle and ventilated tiles roofs.

In this Belgium demo building we demonstrate the RS02 solar roof elements. This means that the watertight layer has crlit ventilated cavity under it. Webshop Koop ons uitgebreid aanbod bio-ecologische houtbouw- en isolatiematerialen online! The construction of the cavity needs enough space at the lower and the upper part of 4dd roof.

Door een zeer grote marktvraag naar houtbriketten en -pellets zijn de Ecopower cwlit niet meer leverbaar op korte termijn. The pictures below present the general principle of the module placement. Omega profiles that will be placed in between 2 panels in order to collect the rain water that may flow in the vertical space between 2 panels. Wurtz screws are used to attach these aluminum profiles to the wood structure.

This guideline shows the practical aspects and experience from the installation.

Construction design RS02 – BFirst

The Celit 4D roof is too soft for that. The first and the last profile of the roof are the special fixture profiles. De precieze openingsuren van onze twee vestigingen, Eurabo Ronse en Eurabo Gent vindt u hier. In this Belgium demo building we demonstrate the RS02 solar roof elements.

  ANNE SCHUTZENBERGER AY MIS ANCESTROS PDF

Schrijf me in voor de nieuwsbrief. The basic construction and the materials for construction are described in guideline b1. Roof layers The construction is built up in felit layers: The house has a roof and a facade. Roof details of the demo house in Mons B.

Also the openings on both sides of the cavity need to be big enough otherwise they will hinder the airflow or even stop it. The profiles can easily screwed in the wooden bat. Nevertheless, the components, materials and their installation process may vary in different cases, thus the information provided in this document should be handled with care, adjusting the installation with regard to the existing roof composition in each case. Then the Omega profiles are placed in between two roofing shingles in order to collect the rain water that will flow in the space between the modules.

Screws Wurtz screws are used to attach these aluminum profiles to the wood structure. Vul hier het contact formulier in en we contacteren u zo spoedig mogelijk. The figures below show the positions and number of these profiles. De Steico Joist-ligger met flenzen is geschikt voor dakconstructies, roosteringen en vervanging van betongewelven in metselwerk. Hoogkwalitatieve bio-ecologische, houtbouw- en isolatiematerialen, met deskundig advies voor vakman en consument.

The omega profiles are manufactured on demand by the local company Facozinc. General principle of the placement of one panel Inserting a panel in the top rail The placement of the EPDM joins Additional T joins are placed to avoid movement by strong wind. Building physics The most important difference between both types are the physic aspects. Traditional roofs with tiles are ventilated roofs. Omega and hook profiles.

  F15 DEPRON PDF

Special fixture Three types of profiles: Not all roofs have this construction. Heeft u vragen over producten, een project of levering? More detailed, the vertical profiles are mounted with screws over the wooden profiles and the Omega profiles on the roof surface alternately every 70 cm. The vertical distance between 2 ALUTEC RL profiles is of the highest importance because this space must allow inserting the panel but must also make sure that the 4 will be difficult to remove by the wind.

The efficiency of PV ccelit is influenced by the temperature of the cells. Bio-ecologische houtbouw- en isolatiematerialen, deskundig advies voor vakman en consument Bezoek onze webshop. Picture of the first produced module. Subsequent corrections are then more difficult to perform than at this point in the installation process.

The ventilation cavity will transport water-vapour from the construction to the outside. The modules are slided in the horizontal profiles and fixed with the use of EPDM joins:. Installation of the modules After the framework is installed, we start placing the modules. The roofing celiy is composed by an insulation material, a set of wooden vertical profiles and a metallic construction support system where the BIPV roofing shingles are installed.

Starting from the left bottom corner of the roof, we mount the first horizontal profile, Then, using a module as a guide, we define the best gap between the horizontal profiles. The house has a roof and a facade.