Pinards PDF

Summer Training Presentation of BHEL Block Limited Ranipur, Haridwar ( Uttrakhand) Submitted To: Mr. XYZ Submitted By: ABC Roll No. Who give me lot of inspiration and skills to complete this Report successfully. Training Report on Manufacturing of Turbo Generator at BHEL Haridwar .. BLOCK-2 Fabrication (Steam, Hydro & gas Turbine) iii. .. 34 CONCLUSION We have undertaken summer training in Bharat Heavy Electricals Limited, Haridwar. View Test Prep – from MECHANICAL I thankfully acknowledge the staff of BHEL, Haridwar for giving me so much co- (Sr. Manager,TUM Block-3) to support me during my Industrial Training. . I cannot even describe how much Course Hero helped me this summer.

Author: Shakus Nihn
Country: Poland
Language: English (Spanish)
Genre: Technology
Published (Last): 24 April 2008
Pages: 24
PDF File Size: 19.9 Mb
ePub File Size: 19.53 Mb
ISBN: 458-3-67667-523-2
Downloads: 72269
Price: Free* [*Free Regsitration Required]
Uploader: Vusar

BHEL is the only hlock in India with the capability to make simulators for power plants, defense and other application 1. It is also placed at 4th place in Forbes Asia’s Fabulous 50 Summer of This induces an electromagnetic EMF in the stator winding. It gave us exposure of the practical implementation of theoretical fundamentals. These are provided with STDP, totally enclosed and duct ventilated enclosures.

The natural frequency of the stator body is well away from any of exiting frequencies. Turbo generator requires water cooling arrangement over and above the usual hydrogen cooling arrangement.

Bhel Haridwar training ppt

To ensure that a high quality product is obtained, strength of material analysis and ultrasonic are performed during the manufacturing rotor. The individual turn of coil are insulated against blocm other by interlayer insulation. For handling and transporting components overhead crane and electric driven transfer trolleys are ssummer. Click here to sign up. As a result, they have been adopted widely in the fan and compressor stages of the gas turbine for both disc and blade applications.

  COURTING SUSANNAH LINDA LAEL MILLER PDF

Further these half turns are brazed in series to form coil on the rotor model 4. It is also as electromagnet and to give it necessary magnetic strength, the winding must carry a very high current.

INDUSTRIAL TRAINING AT BHEL, HARIDWAR

P turbine and less than the high pressure turbine H. Insert ring is shrunk on the rotor is an overhang position. The coil are wound that two poles hadidwar obtained.

BHEL is today the largest engineering enterprise of its kind in India, with a well-recognized track record of performance rport profits continuously since Jawaharlal Nehru’s vision was bestowed with the onus to make the country self-reliant in manufacturing of heavy electrical equipment. The rotor teeth at the rotor body are provided in radial and axial poles enabling cooling air to be discharged. Industrial valves and Fabrication. WindmillSolar water heating system. All welded joints exposed to hydrogen are specially made to prevent leakage.

Steam generator up to MW unit size. To reduce the stray losses and have high strength, the rings are made up of non-magnetic cold worked material.

DC voltage is applied to field winding through the slip rings. This field is also controlled by taking feedback from main generator terminal voltage, to control exciter field variation by automatic voltage regulator. Each blade is screwed at its root with a threaded pin. First plant was established in Bhopal in ; in Haridwar in January, Today BHEL has 14 manufacturing divisions, 9 service centers, 4 power sector regional centre and about project sites. One end of each ring is shrunk fitted on the rotor body while the other hand overhangs the end winding without contact on the rotor shaft.

  IBM PMDC PDF

Most modern micalastic insulation plant for stator bars. The steam passes through the stationary nozzles and is directed at high velocity against rotor buckets causing the rotor to rotate at high speed. The inner cage is usually fixed in the yoke by an arrangement of spring to damper the double frequency vibrations inherent in two pole generator. Log In Sign Up. SCOPE — The procedure covers the measurement of capacitance per phase with respect to ground of the stator winding.

Shall have an adequate margin between critical speed and the running speed to ensure smooth running. We have for RC bock and diode circuit. Electrostatic precipitationAir preheaterFansWind electric generatorsDesalination plants. This ensures unobstructed shaft deflection at end windings.

The principle of the impulse steam turbine consists of a casing containing stationary steam nozzles and a rotor with moving or rotating buckets.

Insulation life endurance test assessment bnel. To carry efficiently electric, magnetic flux.

Bhel Haridwar training ppt

Thermal Power Station Plant. Rotor is inserted in the stator and assembly of end shields, bearings etc. The conductors are made of hard drawn silver bearing copper.

HEEP plant is divided into 8 blocks.

Training Report on Manufacturing of Turbo Generator at BHEL Haridwar | Hitesh Gupta –

It achieved a sales turnover of Rs. In addition, however, the steam upon passing through the moving blades again expands and further drops in pressure giving a reaction force to the blades. For fascinating and monitoring the healthiness of bearing insulation, trzining insulation is provided Fig. Repair shop for power generating equipment.